Preparations of QWR superconducting cavities for beam commissioning

  • Kim, H.; 
  • Jung, Y.; 
  • Kim, J.; 
  • Jang, H.; 
  • Kim, Y.; 
  • 외 5명
Citations

WEB OF SCIENCE

0
Citations

SCOPUS

0

초록

Quarter-wave resonator (QWR) cavities are prepared for beam commissioning. RF conditioning is performed for each QWR cavity. The total heat load, including static and dynamic heat loads, is measured for each cavity. The helium pressure fluctuation is reduced by changing the flow rate, supply pressure, return pressure, cryogenic valve control, etc. The cavity pressure is monitored during RF preparation. The amplitude and phase of the QWR cavity are stably controlled for beam commissioning.

제목
Preparations of QWR superconducting cavities for beam commissioning
저자
Kim, H.; Jung, Y.; Kim, J.; Jang, H.; Kim, Y.; Gil, D.; Jeon, S.; Son, K.; Lee, M.; Ki, T.
DOI
10.1088/1742-6596/2687/8/082007
발행일
2024
유형
Proceedings Paper
저널명
Journal of Physics: Conference Series
권
2687