Feasibility study of progressive Latin hypercube sampling and quasi-Monte Carlo simulation for probabilistic risk assessment

Citations

WEB OF SCIENCE

6
Citations

SCOPUS

8

초록

In probabilistic risk assessment (PRA), two main methods exist for quantifying fault trees: theoretical and empirical (sampling). The efficiency of PRA quantification varies depending on the sampling method used. This study evaluated the feasibility of using quasi-Monte Carlo simulation (Quasi-MCS) and progressive Latin hypercube sampling (P-LHS) for PRA quantification. Eight risk outcomes were derived through PRA for internal and external events in four cases. The PRA convergence, variability, and error rates of each sampling method were compared and analyzed. The comparison analysis revealed that all sampling methods had an error rate of approximately 2% with 9,000 total samples. P-LHS exhibited the best convergence and variability among the methods, followed by Quasi-MCS and LHS. Although Quasi-MCS showed more significant variability than LHS as the number of events increased, its error rate remained within 2% with 9,000 samples. Therefore, both P-LHS and Quasi-MCS are feasible for PRA quantification.

키워드

Probabilistic risk assessment (PRA); safety assessment; progressive Latin hypercube sampling (P-LHS); Quasi-Monte Carlo Simulation (Quasi-MCS); risk quantification
제목
Feasibility study of progressive Latin hypercube sampling and quasi-Monte Carlo simulation for probabilistic risk assessment
저자
Jin, Seung-Seop; Kim, Gungyu; Kwag, Shinyoung; Eem, Seunghyun
DOI
10.1080/19475705.2024.2425185
발행일
2024-12-31
유형
Article
저널명
Geomatics, Natural Hazards and Risk
권
15
호
1